Saturday, November 15, 2008

Sunday, November 2, 2008

Mending

I've spent the last few days working on a project which moved directly from the back of my head to the front burner upon the realization that I had 'misrescheduled' a crit. The genesis for this project came from a dark, lonely night in the studio when I was feeling a bit stagnant. It had always bothered me that the previous occupant(s) of my studio neglected to give the work bench proper respect and managed to wantonly drill into it over and over. As if a work bench is expendable scrap wood. I took it upon myself to heal the bench, restore some of its dignity, by filling those wounds with stainless steel set screws. Recently I have been feeling like a fair amount of my time at Cranbrook has been spent fixing other people's fuck ups. This project is partly a commentary on that feeling of resentment, partly a good old fashioned charrette, partly an opportunity to explore the life objects live in their photos, and partly another opportunity to explore my interest in joints.



Sunday, October 26, 2008

Digital Fabrication...

We just took delivery of our CNC Plasma/Router Table! It is a partial DIY set up which comes with gantry, rails and controller. I'll be building the table base which, with its 'smart' joint, will allow for future accessories and capabilities such as a water table for plasma cutting, 24" diameter 4th axis rotary cutting, an additional 6" of Z travel (12 inches total). The joint also allows for the table to be disassembled and dimensionally expanded...





Thursday, October 2, 2008

new beginnings at cranbrook

out with the old:
in with the new:

Saturday, August 16, 2008

sprout


First sign of new life on the jobsite... the jungle wants it back.

Saturday, August 9, 2008

ABS, PET, TPE

After a long week of meeting with structural engineers and contractors, we had the pleasure of spending an afternoon in a plastics factory in the southern outskirts of Bangkok yesterday. We learned about the differences between injection-molding and blow-molding, saw all types of plastic pellets being mixed with pigment, witnessed some very serious (and very hot) machinery at work, watched igloos and coolers being insulated and assembled, and sifted through a room full of very expensive water-cooled billet steel molds.


Melted polypropylene waste from the injection-molding process, to be ground up and re-melted.


Watching the injection-molding process with Khun Saman.


An old-school machine heats up thick domes of PET before being blow-molded into a water bottle.


Their stock of steel molds-- each costs (on average) $2000 to fabricate. Because they are too heavy to carry, they are lifted and put into place with beam trolleys. An in-house metal shop is fully-equipped to fabricate and fix molds when necessary.


A blow-molding machine (my personal favorite) makes translucent water bottles.

Wednesday, July 30, 2008

hurray for Wall-E!

Wall-E (seen on the left side of the picture with his dump truck buddy) did a great, efficient job with the grading. We were there every day with icy cold beverages (Wall-E likes a fresh bottle of M-150, the malt liquor of energy drinks), and thankfully it never rained. Now half of our site is well above water level, ready for construction next summer. We are running a large pipe along the side of the property to drain any surface run-off to the klong (canal) behind the site. If time permits, we will also plant a wall of bamboo along that same side, up against the neighboring school/temple fence.