Wall-E (seen on the left side of the picture with his dump truck buddy) did a great, efficient job with the grading. We were there every day with icy cold beverages (Wall-E likes a fresh bottle of M-150, the malt liquor of energy drinks), and thankfully it never rained. Now half of our site is well above water level, ready for construction next summer. We are running a large pipe along the side of the property to drain any surface run-off to the klong (canal) behind the site. If time permits, we will also plant a wall of bamboo along that same side, up against the neighboring school/temple fence.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment